NaxCFI

NaxCFI Wireless Services

Wireless 4G/5G

Supporting clients in scaling execution and accelerating infrastructure deployment.

Network Planning · Coverage Design · 5G Rollout · full turnkey projects

3–5× More Cell Sites
0 G
Networks improvement
0 %
5G Issues, RF-Solvable
0 %

Wireless 4G/5G

NaxCFI Wireless Services

Network Planning · Coverage Design · 5G Rollout · full turnkey projects

Expert Wireless planning, network performance , and 5G deployment support for telecoms operators, tower companies, and enterprises across India and the United States.

The 5G Deployment Opportunity is Now

Massive 5G Rollout

AT&T, Verizon, and T-Mobile are deploying 5G at unprecedented pace. Each macro site requires wireless planning, integration testing, and performance support.

LTE

Despite 5G growth, 80% of mobile traffic still runs on LTE. Operators need continuous 4G/LTE to maintain QoS while transitioning users to 5G.

Enterprise Private 5G Networks

Factories, warehouses, airports, and hospitals are building private 5G networks for ultra-low latency automation. This is the fastest-growing wireless engineering segment.

Indoor DAS & Small Cell Expansion

Over 80% of mobile data is consumed indoors. Distributed Antenna Systems (DAS) and small cell design is a $7B+ annual services market — and growing.

NaxCFI Wireless Services

Full-lifecycle Wireless services — from network planning and design through deployment support, drive testing.

Wireless Network Planning & Design

Propagation modelling · Coverage & capacity planning · Frequency planning · Link budget analysis

Drive Test & Walk Test Analysis

Field data collection · TEMS / NEMO analysis · Coverage hole detection · QoS validation · Report generation

4G LTE Performance

KPI analysis · Interference mitigation · Antenna tilt/azimuth · Neighbour cell · Handover tuning

Network Audit & QoS Benchmarking

End-to-end network audit · Throughput benchmarking · Interference audit · Spectrum analysis · Competitor benchmarking

5G NR Planning & Deployment Support

SA/NSA architecture · Beamforming design · mmWave & sub-6 GHz · 3GPP Rel-15/16/17 · MEC planning

Private 5G & Enterprise Wireless

Enterprise 5G design · CBRS band planning (US) · Manufacturing & logistics wireless · Network slicing design

DAS & Small Cell Design

Indoor DAS architecture · Passive/active DAS · Small cell placement · IBS design · Link budget & splitter design

Wireless Reporting & Analytics

Custom KPI dashboards · MR analysis · OMC data analytics · Automated reporting frameworks

Remote Integration Services

Remote Installation · Configuration · Testing & Turn-Up

India-based, US timezone-aligned remote integration engineers with direct AT&T OSP project experience — delivering network deployment, configuration, and turn-up
support at 40–60% lower cost than on-site teams.

Remote Integration

Cost saving vs on-site engineer visit
0 %
Scheduling delay eliminated per site
0 hr
NaxCFI compliance framework standard
0 ATP

Three Core Service Pillars

NaxCFI covers all three phases: pre-installation setup, full configuration & integration, and systematic testing through to live site activation.

01

Remote Installation

Site prep advisory

Power, rack, grounding & cable management verification

Compatibility assessment

New elements vs existing infrastructure check

IP & firewall planning

Addressing scheme and firewall rules pre-install

Credential provisioning

Remote test account setup and access management

Field-NOC coordination

Real-time remote support for on-site technicians

Pre-install punch-list review

Completion verification before equipment goes live

02

Configuration

ERS configuration

Emergency Routing Service — FCC 911 compliance

Telephony integration

SIP trunks, dial-plan, codec negotiation, call flow

Data network integration

VLAN, BGP/OSPF routing, QoS policy alignment

Data validation

Inventory accuracy in TIRKS, NSR, AT&T systems

Monitoring setup

SNMP traps, email alerts, threshold-based alarms

Custom integration requirements

Enterprise-specific and carrier interconnect configs

03

Testing, Turn-Up

IP connectivity validation

End-to-end path, latency baseline, packet loss

ATP checklist execution

Feature-by-feature sign-off per AT&T standard

Fallback scenario testing

Redundancy activation, failover timing, restoration

Performance testing

Load simulation, throughput vs contracted SLAs

Troubleshooting

Root cause isolation for any ATP deviations

Live mode activation & handoff

Controlled turn-up + 30-min monitoring + ATP report

ERS & ATP — NaxCFI's Technical Core

The two most critical and non-negotiable elements of for remote integration. NaxCFI engineers are trained, practised, and documented on both.

ERS — Emergency Routing Service

FCC-mandated 911 compliance configuration on every AT&T network element. Zero tolerance for errors.

ALI database configuration

Automatic Location Identification record setup

PSAP routing validation

Correct routing to Public Safety Answering Point

Callback number provisioning

Accurate ANI / phone number for 911 dispatch

Failover route testing

911 still routes correctly when primary path fails

Compliance documentation

FCC and AT&T audit-ready records for every site

Re-certification on change

ERS re-validated after any network config change

ATP — Acceptance Test Plan

AT&T’s structured sign-off methodology. Every site must pass ATP before going live. NaxCFI executes the full plan.

IP connectivity test

End-to-end ping, traceroute, latency baseline

Feature-by-feature validation

Every provisioned feature tested and signed off

Performance benchmarking

Throughput vs contracted SLA — pass/fail logged

Fallback & redundancy test

Primary failure simulated, secondary path verified

Negative testing

Invalid inputs, overload scenarios, error handling

ATP report generation

Signed document delivered to AT&T project manager

Three Engagement Models

01

Per-Site

One activation per request

Scope brief → configure → ATP

Typical 4–8 hrs/site

AT&T ATP report on completion

Same-day turnaround available

02

Monthly

Dedicated RIS engineer(s)

Priority scheduling on all sites

Weekly project sync + reports

Integration runbook maintained

Scales with your programme

03

Programme

Full RIS team embedded

Custom AT&T workflow integration

Dedicated NOC coordination

Programme-level ATP tracking

SLA-backed delivery commitment

Scroll to Top
Call Now Button